The Tennessee Department of Transportation says roadwork in Coffee and Franklin counties will bring lane reductions, flagging and closures during its Oct. 15–21 roadway activity period, including work on routes in and around Tullahoma.
In Tullahoma, Phase 3 of widening and bridge replacement on SR-55 (Wilson Avenue), between First Avenue and SR-16 (U.S. 41A/North Jackson Street), will continue this week, with traffic reduced from three lanes to two—one lane in each direction—and intermittent flagging for construction activity, TDOT said. The contractor is Dement Construction Company, LLC, according to the department.
At I-24 Exit 117, the westbound entrance ramp is scheduled to be closed from Oct. 12 at 7 p.m. until Oct. 19 at 6 a.m. for grading and paving tied to a phase shift, TDOT said. A signed detour will direct traffic to Exit 114 to reach westbound I-24, and ramps at the interchange have a 12-foot width restriction, the announcement said.
TDOT also said SR-127 is closed at the bridge at mile marker 9.76 for replacement, with the closure expected to last until Aug. 12, 2027, and a signed detour in place. On SR-16 (South Jackson Street), flagger-assisted lane closures between New Rock Creek Road and West Monroe Street are listed through Oct. 30, from 9 a.m. to 2 p.m., the department said.
In Franklin County, flagger-assisted lane closures on SR-130 (Old Tullahoma Road), between Audubon Road and Bible Crossing Road, are scheduled Oct. 20 through Nov. 20, from 9 a.m. to 2 p.m., TDOT said. Daily resurfacing lane closures on SR-15 between Belvidere Lane and Veterans Memorial Drive are set to begin Oct. 19, with one lane in each direction maintained, according to the announcement.



